| Date |
Activity |
| 30/10/2004 |
Uploaded the monthly
report documents and picture of the final dinner. |
| 23/10/2004 |
Final dinner at Langtons. |
| 15/10/2004 |
Project exhibition. |
| 11/10/2004 |
Meeting at Pacsoft to
discuss the content and layout of the exhibition which is to be held on 15th
October, this Friday. |
| 08/10/2004 |
Project Handover
presentation at Pacsoft. Finally the project can be formally announced as
FINISHED! |
| 06/10/2004 |
Finished the system
documentation (131 pages), a copy is given to the sponsor company and
another copy sent to our project supervisor. |
| 02/10/2004 |
Final testing of the
system. Again, found a few small bugs, fixed them. |
| 30/09/2004 |
Busy working on all the
documentations needed to support the system. Will have the final monthly
report meeting with our project supervisor tomorrow. |
| 25/09/2004 |
The final presentation for
the project was held in OCH today, all went pretty well |
| 24/09/2004 |
Fixed the bugs and
fulfilled some of the requirements from the review. Preparing for the final
presentation tomorrow. |
| 22/09/2204 |
Working on the technical
documentation and user documentation. |
| 21/09/2004 |
Project review with
Bostjan, found some bugs and commented on the functionality of the site. |
| 20/09/2004 |
Uploaded the website to
the Pacsoft server, now the site can be accessed on the internet! |
| 15/09/2004 |
Updated website, ready for
setup at Pacsoft onto the internet. |
| 10/09/2004 |
Second project review was
not held because our technical supervisor was away, had a introductory
presentation with our sponsor showing all functionalities of the system. |
| 08/09/2004 |
Handed the completed site
(even though not all codes are documented yet) along with user
documentations (including user guide, administrator guide, setup and
installation instructions) ready for the second project review. |
| 03/09/2004 |
Showed the completed parts
to our sponsor, even though satisfied overall, Chris requested for features
such as allowing user to dynamically add multiple input columns, this has
been found very hard to achieve for a web application. |
| 02/09/2004 |
Finished all the coding on
the administrator part, input kpi and can provide basic analysis reports. |
| 26/08/2004 |
Cleaning the code,
informed about the second project review on the actual functionality of the
whole system. Scheduled to be held on Friday, 10 Sep |
| 24/08/2004 |
First project review with
our technical supervisor, he commented on the coding style, the use of
comments and on some of the features of the user interface. |
| 19/08/2004 |
Handed in the documents
and all the codes we have written so far to our technical advisor for the
review meeting on the project progress on Tuesday 24 August. The documents
included the project specifications, installation and set up instructions,
technical documentations, the database and the project solution. |
| 15/08/2004 |
Finishing off the
administration part, and started integrating all components and the database
that we have been using. Since the transition to using an utility provided
by Pacific Softworks for implementing the data access control, some original
aspects of the system website needed to be altered. |
| 10/08/2004 |
The development phase is
near completion, will integrate all components and database together
shortly, and plan to start on testing and documentation in the upcoming
week. |
| 06/08/2004 |
We split the task up and
worked on each components individually, making a good progress on kpi input,
report generation and administrative aspect of the web site. |
| 03/08/2004 |
The database is handed to
the sponsor. |
| 02/08/2004 |
Meeting with sponsor to
discuss analysis report layout, start on implementation. |
| 30/07/2004 |
Meeting with sponsor,
discuss the progress and estimate completion time. |
| 26/07/2004 |
Obtained the final
database structure from Pacsoft. |
| 21/07/2004 |
Expect to finalising the
main database structure with our technical supervisor |
| 12/07/2004 |
Held a little
demonstration with our project sponsor and technical supervisor, they
suggested a few changes. Start working on the client side user interface. |
| 01/07/2004 |
Continuing working on the
administrator interface |
| 12/06/2004 |
Exam period |
| 09/06/2004 |
Working on the
administrator's user interface. 8 hrs |
| 31/05/2004 |
Monthly report was written
and had a meeting with our supervisor. |
| 25/05/2004 |
Spend the whole day in
Pacsoft to set up the softwares. Finally got an example site running for
commerce server. Looked into the tutorials provided by our sponsor. 6 hrs |
| 24/05/2004 |
Setting up the system
platform and working environments including Windows Server 2003 and Commerce
Server 2002. |
| 15/05/2004 |
Specification Presentation
and handed in the system specification! |
| 14/05/2004 |
Dry-run presentation to
the project sponsor, made a few changes to make it better. Finished system
specification. |
| 13/05/2004 |
Group meeting working on
system specification and starting to prepare for the specification
presentation. 10 hrs |
| 12/05/2004 |
Meeting with project
sponsor regarding the system specification, made a few modifications on the
system specification. 5 hrs |
| 10/05/2004 |
Presentation dry-run with
Gerard Dunne, and presented the system specification to our sponsor Chris. |
| 09/05/2004 |
Group meeting to prepare
for the specification presentation. |
| 08/05/2004 |
Finishing System
specification. |
| 05/05/2004 |
Meeting with our project
supervisor Gerard Dunne on monthly report and the progress during April. |
| 04/05/2004 |
Pacsoft meeting discussing
about system analysis and user requirements. |
| 03/05/2004 |
Working on design and
prepare the system specification including documentation approach,
testing
procedure, implementation approach etc. |
| 02/05/2004 |
Working on system design 8
hrs |
| 01/05/2004 |
Group meeting working on
system analysis. 8 hrs |
| 30/04/2004 |
Meeting at Pacsoft to set
up commerce server. 2 hrs |
| 27/04/2004 |
Went to Pacsoft to set up
the necessary environment for the project.
Enrolled as BTech450! |
| 24/04/2004 |
Group meeting to work on
the monthly report and system analysis. 2.00 pm ~ 10.00 pm |
| 21/04/2004 |
Meeting with Gerard dune,
supervisor for our group, about the contents of the project.
Approval from the Infosys Department and BTech Department to do the project. |
| 20/04/2004 |
Initiative to join the
project, meeting with Lech Janczewski, IS340 supervisor, and first
meeting
the the project sponsor Chris Thomas and technical advisor for the project Bostjun Augustin. |