5th Mar

First meeting with NZinstitute.

8th Mar

First weekly meeting for NZinstitute attended

9th Mar

First meeting with Mano

11th Mar

First project idea discussed

15th Mar

Draft idea of database of past data on NZahead introduced

22th Mar

Project proposal formed for NZinstitute

23th Mar

Second project for ISSG proposed

25th Mar

Introductory seminar, project with ISSG accepted.

26th Mar

Started to learn about ASP.net

4th April

Database design for NZahead started

8th April

Database design for NZahead finalised

9th April

First meeting with ISSG, Learnt database is in progress.

22th April

Been busy with Assignments, but still learning ASP.net. Draft ideas of website designs coming out.

7th May

Draft paper prototypes of website designs are being implemented.

18th May

First 'technical' meeting with ISSG. Started to discuss design issues with Shyama,
and implementation will start mid-late june, when the second database of the species will be received.
First database is being understood.

1st July

Minor changes to the database structure.

9th July

First soft copy of the project started, using draft access DB.

16th July

First draft using real data started to be implemented (v3)

30th July

The structure of the website to change a little, including the interface cleanup. (v4)

13th August

ISSG has talked about a need for a completely new structure of the website. Rebuild (v5)

2nd September

Version 5 of the website handed in. Waiting for feedback. In the mean time, Version 1 of NZahead website being developed.

19th September

First draft of the NZinst website handed in.

10th October

Decision made to remove silverlight and keep with charting controls on ASP 4.

11th October

Preparation for final report/presentation.

20th October

Final presentation of project done.