Date: Tue 24th OctDuration: 4 Hours
Event: Project Handover. Feedback: Project Terminated. Confirmed that all functionality matches original specification. Tried to package Public Assemblies of modules to allow uploading to deployment server. Some issues still to be resolved.
Date: Tue 19th OctDuration: 5 Hours
Event: BTech 450 Final Presentation. Feedback: Final Presentation made and well recieved.
Date: Tue 17th OctDuration: 8 Hours
Event: Testing and Documentation. Public Assembly Packaging. Feedback: Documentation for Approval and Commenting and zipped files of code sent to Seb. These are to be used to test and confirm functionality delivery. Confirmed that all functionality matches original specification. Tried to package Public Assemblies of modules to allow uploading to deployment server. Some issues still to be resolved.
Date: Mon 16th OctDuration: 8 Hours
Event: Code Refactoring. Feedback: Code refactored into seperate Approval and Commenting Modules. It is now ready to be installed as modules onto the main Survey System.
Date: Sat 14th OctDuration: 8 Hours
Event: Coding. Feedback: Coded Settings for Approval and Commenting modules.
Date: Fri 13th OctDuration: 6 Hours
Event: Code Fixing. Feedback: Code for Settings Module fixed and adjusted by setting public property's in Dynamic User Controls. Steven and Seb at AQXI helped acheive this.
Date: Thu 12th OctDuration: 13 Hours
Event: Coding. Feedback: Coding Settings Module. Some troulble with triggering of methods and passing of property's. Methods in Dynamically loaded User Controls not responding.
Date: Tue 10th OctDuration: 4 Hours
Event: Code Cleanup. Feedback: Code Cleanup.
Date: Sat 7th OctDuration: 2 Hours
Event: TIF Report. Feedback: Documented and Sent TIF Report to Alex. Alex is to forward documents to TIF in this week.
Date: Tue 3rd OctDuration: 6 Hours
Event: Coding. Feedback: Fixed UI Flaws in Approval and Commenting
Date: Mon 2nd OctDuration: 5 Hours
Event: Laptop Setup. Feedback: Set up Phil's Laptop to get it to support my development environment. Modification of previous DNN Installs and synchronisation of Databases
Date: Sat 30th SepDuration: 4 Hours
Event: Documentation. Feedback: Combined documentation for Moderation Sub System prepared
Date: Sat 30th SepDuration: 3 Hours
Event: Laptop Recovery. Feedback: Laptop not repairable today. To get IS340 intern Phil's Laptop to continue work.
Date: Fri 29th SepDuration: 1 Hour
Event: Progress Report. Feedback: Progress report sent to Alex.
Date: Thu 28th SepDuration: 4 Hours
Event: Laptop Malfunction. Feedback: Laptop Malfunction. Hardware problem. Reported to Alex. To meet on Saturday to fix it.
Date: Wed 27th SepDuration: 1 Hour
Event: Progress Meeting. Feedback: Progress meeting with Alex. Demo of System and TIF Grant Discussed.
Date: Thu 14th SepDuration: 1 Hour
Event: Progress Meeting. Feedback: Progress meeting with Seb. Requirement for documentation and plan for next 2 weeks discussed. Seb on leave, Steven to manage coordination and requirements.
Date: Tue 12th SepDuration: 0.2 Hours
Event: Follow Up. Feedback: Requested clarification via email on specification. Progress meeting requested and coordinated.
Date: Thu 31st AugDuration: 2 Hours
Event: Development. Feedback: Fixed some UI problems. Waiting on clarification of specifications.
Date: Wed 30th AugDuration: 0.5 Hours
Event: Demo of functionality. Feedback: Identification of minor flaws, feedback on implementation. Requirement for documentation for entire system. Clarifications of specification expected.
Date: Mon 28th AugDuration: 1 Hour
Event: Progress Meeting. Feedback: Progress meeting, Demo of work completed, Request for 2 day extension to complete requirements granted.
Date: Sat 26th AugDuration: 5 Hours
Event: Development Feedback: Most functionality and requirements implemented. Some functionality not clear. Clarifications required.
Date: Thu 24th AugDuration: 6 Hours
Event: Troubleshooting. Feedback: Figured out problems with inheritance from PortalModuleBase vs WebComponent. Changed toolbox as required. Methods now trigger as expected.
Date: Tue 22nd AugDuration: 5 Hours
Event: Develop comments and approval system. Feedback: Spent time trying to develop Commenting and Approval system. Page Load methods are not triggering as expected.
Date: Sun 20th AugDuration: 4 Hours
Event: Received Toolbox from Hitesh. Feedback: Understanding toolbox working and usage.
Date: Sun 13th AugDuration: 0.2 Hours
Event: Request for Toolbox Specification. Feedback: Waiting for toolbox specification from project manager. Email sent.
Date: Tue 9th AugDuration: 0.2 Hours
Event: Quick meeting with seb to discuss new responsibility. Feedback: Assigned to Moderation system.
Date: Mon 7th AugDuration: 3 Hours
Event: Progress meeting with Seb, project restructuring, reassignment of teams, New roles and responsibilities set.Feedback: Concerns with project delivery on due date. Project scope minimised to essential functionality
Date: Sun 6th AugDuration: 3 Hours
Event: Discussion and integration with Hitesh and Phil's modules at Aqxi.Feedback: Demo Prototype for survey system framework ready.
Date: Sat 5th AugDuration: 3 Hours
Event: Survey Template matched to user interface and exported. Methods studied for removing user profile consistency across portals.Feedback: User Profile Inconsistency noted across different ASP Applications. Framework code insufficient to ensure profile consistency across applications. Alternate multi application profile manager option noted.
Date: Fri 4th AugDuration: 8 Hours
Event: DNN Portal For Survey Creation Implemented. Tested. Problems highlighted and noted. Template for surveys implemented. Role and User Testing done for various scenarios.Feedback: Create Survey as a Portal Module tested with various scenarios. Template for Survey implemented and Tested.
Date: Thu 3rd AugDuration: 8 Hours
Event: Breakthrough in using ASP Membership functions.Feedback: Solution with default DNN Core implemented successfully.
Date: Wed 2nd AugDuration: 2 Hours
Event: Modification and Testing of DNN Core and Stored Procedures. Feedback: Plenty of crashes and system unstability
Date: Mon 31st JulDuration: 17 Hours
Event: Project Progress Meeting With Seb. + Change in Implementation StrategyFeedback: Implementation of User addition to portal Via changing DNN Core Portal Security modules.
Date: Sun 30th JulDuration: 8 Hours
Event: Researching Addition of users to new portalFeedback: Researching ASP_Membership functions and testing options for user addition to new portal.
Date: Sat 29th JulDuration: 14 Hours
Event: All Functinoality for module including role addition completed. Only addition of users to new portal remaining.Feedback: Addition of users to new portal investigated
Date: Fri 28th JulDuration: 7 Hours
Event: ASP Membership Functions, Core Modification, Third Party component assessed.Feedback: Progress Meeting with Seb. Status and problems with implementation discussed.
Date: Thu 27th JulDuration: 9 Hours
Event: UI For Addition of users and roles.Feedback: Implementation of Create Portal tested. UI For Addition of users and roles done.
Date: Tue 25th JulDuration: 9 Hours
Event: DNN Portal creation. DNN Crash.Feedback: ReInstallation of DNN.
Date: Sun 23rd JulDuration: 7 Hours
Event: Implementing Portal CreationFeedback: Portal creation functionality implemented
Date: Sat 22nd JulDuration: 3 Hours
Event: Researching DNN Portal Creation and debugging minmax and host user problemsFeedback: MinMax errors fixed. Host User not acceptable by framework as admin to new portal
Date: Fri 21st JulDuration: 3 Hours
Event: Survey Creation Module UI, MinMax Errors, Namespace problems Feedback: Namespace and setup problems identified and debugged to an extent
Date: Thu 20th JulDuration: 2 Hours
Event: Creating a DNN Module using DNN TemplatesFeedback: Portal creation research. Portal Creation Module project created
Date: Tue 18th JulDuration: 2 Hours
Event: Researching DNN Portal CreationFeedback: Portal creation research. Portal creation functions identified in DNN core
Date: Fri 14th JulDuration: 7 Hours
Event: ERDs and SRS updatedFeedback: Updated SRS Approved and Discussions on Project scope and ERD.
Date: Thu 13th JulDuration: 7.5 Hours
Event: Database Design and ERD'sFeedback: Feedback on screenflow and database design noted. Feedback on updated SRS awaited.
Date: Wed 12th JulDuration: 10 Hours
Event: Screen flow and Screen Design Consistency checksFeedback: Documents checked, modified and made consistent.
Date: Tue 11th JulDuration: 7.5 Hours
Event: ERD's State diagrams and Screen Design Consisteny checksFeedback: Progress Meeting with Seb
Date: Fri 7th JulDuration: 6.5 Hours
Event: Database Design and ERD'sFeedback: Feedback on screenflow and database design noted. Feedback on updated SRS awaited.
Date: Thu 6th JulDuration: 6.5 Hours
Event: SRS Updates and consistency matchingFeedback: SRS Updated for consistency and documents matched for coherence.
Date: Wed 5th JulDuration: 9 Hours
Event: Entity diagrams discussed, Screen Flow and SRS modifications assessed by Project ManagerFeedback: Small inconsistancies pointed out by Project Manager. Discussed and noted.
Date: Tue 4th JulDuration: 8.5 Hours
Event: Screen Design, Screen Flow and SRS Updates.Feedback: Screen Design and user interaction discussed in detail. Minor modifications to SRS and Screen Flow.
Date: Mon 3rd JulDuration: 10 Hours
Event: Screen Design, SRS Modification DecisionsFeedback: Decisions discussed and minor modifications made to SRS to accomodate ease of user interaction.
Date: Fri 30th JunDuration: 9 Hours
Event: Screen Flow Design DocumentationFeedback: Screen Flow Docements matched with SRS. User interaction discussed
Date: Thu 29th JunDuration: 9.5 Hours
Event: Design descision on Portal vs. Page Level representation of Survey, Feasability Of DNN Framework for implementation of survey SystemFeedback: DNN Framework acceptable. Portal Level access decided for Surveys for ease of user management.
Date: Wed 28th JunDuration: 8 Hours
Event: Set Up AdHoc Wireless Network, Progress Meeting, decisions on ScreenFlow and 3rd Party componentsFeedback: Regular full Time Work Begins.
Date: Tue 13th JunDuration: 2 Hours
Event: Meeting and Review CoordinationFeedback: Document Approved.
Date: Mon 12th JunDuration: 3 Hours
Event: Updates on Diagrams for Screen Flow And Layout DocumentsFeedback: Document Updated.
Date: Tue 6th JunDuration: 3.5 Hours
Event: Drafting Screen Flow DesignsFeedback: Discussions on Screen flows and user interactions.
Date: Mon 5th JunDuration: 3 Hours
Event: Progress Meeting With Seb and Alex to discuss next months progressFeedback: Seb's time off discussed and deliverables set.
Date: Sun 4th JunDuration: 0 Hours
Event: Report and Presentation Approved for Distribution on WebsiteFeedback: Document Approved.
Date: Thu 1st JunDuration: 0 Hours
Event: Report and Presentation sent for Approval for WebsiteFeedback: Document awaiting Approval.
Date: Wed 31st MayDuration: 3 Hours
Event: BTech ReportFeedback: BTech report complete.
Date: Wed 31st MayDuration: 4 Hours
Event: BTech End of Semester MeetingFeedback: Btech Seminar Presented and well Received.
Date: Tue 30th MayDuration: 6 Hours
Event: Btech Report + PresentationFeedback: Btech Report an Presentation Slides Prepared.
Date: Mon 29th MayDuration: 3 Hours
Event: BTech ReportFeedback: Writing the report For University BTech 450 End Of Semester
Date: Sat 26th MayDuration: 0 Hours
Event: SRS ApprovalFeedback: Document Approved. Requirement Specification phase complete. UI Design phase initialised. Design Phase Active.
Date: Fri 25th MayDuration: 5 1/2 Hours
Event: SRS DraftingFeedback: Fine Tuning the SRS. details on various segments added. Sufficient granularity and assumptions made. Document final copy submitted to Alex for Approval.
Date: Thu 24th MayDuration: 1 1/2 Hours
Event: SRS FeedbackFeedback: Discussion with Alex on fine tuning the SRS. Some areas still need specefic details and assumptions. Feedback noted.
Date: Wed 23rd MayDuration: 4 1/2 Hours
Event: SRS DraftingFeedback: Discussions on various aspects of the SRS documentation. Detailing of document areas. Resubmission.
Date: Tue 22nd MayDuration: 4 Hours
Event: SRS DraftingFeedback: Discussions on various aspects of the SRS documentation. More detail of various Survey system workflow aspects discussed. Feedback incorporated.
Date: Mon 21st MayDuration: 2 Hours
Event: SRS Feedback + Progress MeetingFeedback: Feedback on various aspects of the SRS documentation. Document is found to be structured but more detailing is required.
Date: Sat 20th MayDuration: 8 Hours
Event: SRS DraftingFeedback: Discussions on various aspects of the SRS documentation. Document structured and company specefic requirements included. Discussions on various aspects of the workflow and comparision with user requirements notes.
Date: Fri 19th MayDuration: 4 Hours
Event: SRS DraftingFeedback: Discussions on various aspects of the SRS documentation. Process flow structure followed. Discussions on various aspects of the workflow and comparision with user requirements notes.
Date: Thu 18th MayDuration: 2 1/2 Hours
Event: SRS DiscussionFeedback: Submitted SRS draft document considered unclear, with more detailing required. Some roles dropped. Next deadline set as midnight Sat 21st.
Date: Wed 17th MayDuration: 3 1/2 Hours
Event: SRS RequirementsFeedback: Gathered company specefic requirements for the Survey system Project.
Date: Mon 15th MayDuration: 2 Hours
Event: SRS Discussion + Progress MeetingFeedback: Progress meeting with Seb.Discussion on features for Release 1 and Release 2. Discussed issues with Respondent Management roles and rights, Meeting scheduled with Seb on Wednesday at 9am to discuss requirements, as well as Alex. Also a meeting on Thursday at 4.30pm for feedback on SRS documentation, due in the Morning of Thursday 18th May.
Date: Sun 14th MayDuration: 4 Hours
Event: SRS Discussion and DraftingFeedback: Discussion of system perspectives and features for SRS. Sections were split equally between the IS340 and Btech 450 Teams. document to be collated online.
Date: Thu 11th MayDuration: 4 Hours
Event: SRS DiscussionFeedback: Discussin on system perspectives and potential roles and rights. Stakeholders Identified: Access Control, Creation/Editing, Survey Moderation, Respondent Management, Response Analysis, Extraction and Respondent. Brainstorming session scheduled for Sunday 11am - 3pm.
Date: Mon 8th MayDuration: 4 Hours
Event: SRS Lecture + Discussion + JAD SessionFeedback: Seb presented a tutorial on SRS documentation. Best practices of documentation, and perspectives were discussed. a Joint Application Development session was coordinated by the Btech Team to obtain feedback on feature sets for the system, and preliminary scoping of capabilities and features.
Date: Fri 5th MayDuration: 2 Hours
Event: Progress MeetingFeedback: Final decision made from vote between te 2 approaches. Consensus finally reached on Simple Survey Workflow System. Deadlines Set For SRS document as 18th May. Post Production of SRS till 6th May. 1st release date for prototype system is 25th August. Second release tentative for beginning of October.
Date: Wed 3rd MayDuration: 1 1/2 Hours
Event: Online DiscussionFeedback: Meeting between IS340 Team and Btech450 Team to decide on appropriate approach for survey system.
Date: Tue 2nd MayDuration: 4 Hours
Event: DiscussionFeedback: Further discussion on the approach of survey systems. Assessing the risks involved with each approach, from a competetive standpoint, as well as a financial risk point of view. Decision on exact market and approach to be taken by the end of this week.
Date: Mon 1st MayDuration: 4 Hours
Event: Market Research PresentationFeedback: The discussion after the initial presentation of research involved reviewing ideas on the Survey System Model, markets and prospects. I suggested changing the model of current systems to adapt to current trends of content injection and design a system to facilitate survey injection into relavent areas of context. This idea is currently countered by an opinion of developing a simple survey system that supports the current survey workflow.
Date: Fri 21st AprilDuration: 6 Hours
Event: Market Research + Progress MeetingFeedback: Met with Prof Alistair Scott From Dept of Statistics at UOA. Progress Meeting at Aqxi Limited. Collation of material from the IS group as well as previous research, to specify a features list. It is identified that different markets will have different needs and priorities in terms of system features. Desicion is required on target market.
Date: Thu 20th AprilDuration: 4 Hours
Event: Market ResearchFeedback: Coordinated and met with Prof Andrew Balemi From Dept of Statistics at UOA. Coordinated and scheduled meeting with Alistair Scott from the dept of Statistics at UOA.
Date: Wed 19th AprilDuration: 4 Hours
Event: Market ResearchFeedback: Coordinated Interview and met with David Sundaram from Dept of ISOM at UOA. Requested appointments from staff from the Statistics Dept. Collated results from previous research and interviews.
Date: Tue 18th AprilDuration: 8 Hours
Event: Progress Meeting + Market ResearchFeedback: Presented research results to Aqxi. Informed of delay in market research from the IS team. Asked to take up research and requirements gathering from Academia, esp. The University Of Auckland. Coordinated and met with Dr John Paynter from Dept of ISOM Dept in UOA.
Date: Mon 17th AprilDuration: 4 Hours
Event: ResearchFeedback: Compiled features list available in current systems. Cross tabulated evaluations of 5 systems and completed the report.
Date: Thu 14th AprilDuration: 3 Hours
Event: Planning MeetingFeedback: Coordinated with IS 340 team for next deliverables. Decided that the Btech team would persue Existing Systems and the IS team would persue Market Research companies, for user input.
Date: Mon 10th AprilDuration: 4 Hours
Event: ResearchFeedback: Research on existing Survey management Systems online.
Date: Fri 7th AprilDuration: 2 1/2 Hours
Event: Planning Meeting + ResearchFeedback: Coordinated Plan for research and breakdown of work for next deliverables. Research on existing Survey management Systems.
Date: Mon 3rd AprilDuration: 5 1/2 Hours
Event: Module Deployment + Development Evaluation + Planning Meeting + ResearchFeedback: User Group Manager Packaged for Deployment; User Group Manager Evaluated; Schedule set for Next deliverables. Introduction to Survey Management System Expectations.
Date: Sun 2nd AprilDuration: 7 Hours
Event: Module Development + Troubleshooting + TrainingFeedback: Completed User Group Manager Module. Streamlined functionality with correct databinding. Cleaned up code. Researched Packaging for Deployment
Date: Sat 1st AprilDuration: 4 Hours
Event: Module Development + Troubleshooting + ResearchFeedback: Solved list population problem.
Date: Fri 31st MarchDuration: 4 Hours
Event: Module Development + TroubleshootingFeedback: Working on list Population. Errors using ASP CMS Controller classes.
Date: Thu 30th MarchDuration: 4 Hours
Event: Module Development + TroubleshootingFeedback: Completed User Group Manager UI. Started work on correct list population.
Date: Tue 28th MarchDuration: 4 Hours
Event: Module Development + TroubleshootingFeedback: Worked on User Group Manager UI. Trouble with DataBinding
Date: Mon 27th MarchDuration: 5 Hours
Event: Module development + ResearchFeedback: Started User group Manager module. Researched User and Perission management on ASP CMS
Date: Sat 25th MarchDuration: 10 Hours
Event: Training Videos + Sample Code DevelopmentFeedback: Completed Training Videos on development, Blog Module Completed.
Date: Fri 24th MarchDuration: 5 Hours
Event: Training Videos + Sample Code Development + TroubleshootingFeedback: Continuation of training videos, Blog module development, and troubleshooting
Date: Mon 20th MarchDuration: 8 1/2 Hours
Event: Training Videos + Sample code development (Blog Module)Feedback: Blog Module half done, following training instructions.
Date: Fri 17th MarchDuration: 4 1/2 Hours
Event: TIF Grants + Project ManagementFeedback: TIF Grant applications completed, Assignment for training phase chosen: User Group Manager Module
Sample Training module chosen: Blog Module
Date: Mon 13th MarchDuration: 8 1/2 Hours
Event: Laptop Setup + Installation + ResearchFeedback: Completed Laptop Setup; Started Training Videos
Date: Sun 12th MarchDuration: 6 Hours
Event: Setup LaptopFeedback: XP, IIS, SQL Server, Licencing setup.
Date: Fri 10th MarchDuration: 5 Hours
Event: Setup/Install IIS, SqlServer, Network PermissionsFeedback: Intranet system setup
Date: Wed 8th MarchDuration: 1 1/2 Hours
Event: Planning meetingFeedback: Set weekly Schedules, NDA Signed
Date: Tue 7th MarchDuration: 1 Hour
Event: Planning MeetingFeedback: Schedules discussed and Commitments Confirmed
Date: Sunday 5th FebDuration: 2 Hours
Event: Setup + Installation + ResearchFeedback: Setup Unsuccessful: System crash
Date: Tue 28th FebDuration: 1 Hour
Event: InterviewFeedback: Intervew Successful